Financial Year 2025-2026 • Document Ref: #TR-SRB-440

Transparency & Governance

Institutional disclosure on funding sources, operational overhead, and data sovereignty protocols for the Global Student Mobility Grant.

How the Grant is Sustained

FreeeSIM.edu.rs operates on a strictly non-profit basis. As a project hosted by the Educational Infrastructure Council (EIC) in Belgrade, our 3GB data modules are provisioned through a tripartite funding model involving public grants, private CSR contributions, and bulk capacity partnerships.

  • 65% Public Educational Grants (EU & Regional Funds)
  • 20% Corporate CSR Contributions (Tech & Telecom)
  • 15% Private Academic Donors & Foundations

*Figures based on Q4 2025 Fiscal Audit.

Academic Impact Report

Transparency is reflected in our ability to convert funding into active student connections. Below are the verified metrics for the current academic cycle.

94.2%
120k+
$0.00

Operational overhead (staff, servers, and administration) is capped at 5.8%, managed by a volunteer-led engineering team to ensure maximum grant utilization.

📄

2026 Institutional Audit & White Paper

Download the verified academic disclosure including the technical architecture of the GSMA provisioning tunnel, fiscal audit for the 2026 cycle, and student data purge protocols.

Format: PDF • Size: 390 kb • Ref: #EIC-SRB-2026-TR
Download Report

Institutional Data Handling

In accordance with GDPR (General Data Protection Regulation) and Serbian national privacy statutes, FreeeSIM.edu.rs enforces a "Zero Monetization" policy. Student data is used exclusively for institutional verification.

The 48-Hour Purge Protocol

Once an eSIM module is provisioned and the institutional TLD (e.g., @university.edu) is verified, all Personally Identifiable Information (PII) is flagged for systematic erasure from our primary handshake servers within 48 hours. Only anonymized metadata is retained for grant reporting purposes.

🛡️
Cybersecurity Audit Status

Verified Secure by Belgrade Volunteer Security Group. Last Audit: February 2026. AES-256 Provisioning Tunnel: Active.